Code: COGEIM - Orizontal 2000 x 1000
Description
Tunnel – pass-through shot blasting installation for the treatment of sheets/plates, rolled channels, angle irons and composed welded structures.
Max. pass-through section: width 2 m, height 1 m.
It is provided with no. 6 or 8 turbines depending on the required output; it can also be equipped with a brush – blow-off system for the recovery of residual abrasive.
The material is transferred by motorized roller conveyor provided with outlet hopper and screw conveyor which recovers the abrasive and send it back into the machine.